悠悠车系列
Yo-yo Series
Compact 4-seater with a cute, kid-pulling design — 100 km range.
Solutions · Fleet operators
Shared-mobility operators need a reliable OEM for geofenced, smart, container-friendly vehicles at scale. Minibus EV — the factory behind Leqi’s 147+ scenic-area deployments — is built for exactly this.
Industry snapshot
Shared and self-operated mobility in scenic areas is a proven model: our operating partner Leqi has deployed across 147+ scenic areas and 25+ cities with 0 safety accidents. Operators worldwide need the same vehicle platform and supply reliability.
Recommended models
Models our operating data shows fit this industry. Each can be themed and branded to your operation.
Reading list: See the full Electric vs Gas comparison, landed cost breakdown, and complete buyer's guide for the math behind this industry’s fleet decisions.
悠悠车系列
Compact 4-seater with a cute, kid-pulling design — 100 km range.
Why: Core shared-mobility workhorse — proven in Leqi scenic-area deployments.
哆啦系列
Cartoon-character theme engineered for repeat rides and kid appeal.
Why: Themed option to differentiate a shared-mobility brand in family destinations.
Case study
乐骑景区运营网络 · 25+ cities, China
Our operating partner Leqi runs self-operated shared mobility across 147+ scenic areas and 25+ cities, with 0 safety accidents and a 15-day average deployment from contract to operational. This is the same vehicle platform and operating model available to international fleet operators. Per-asset revenue and utilization: [NEEDS_VERIFICATION].
Metrics marked [NEEDS_VERIFICATION] await manufacturer confirmation. We publish only verified figures.
Fleet operators partnering with Minibus EV get a proven vehicle platform, container-load pricing, and an operating model tested at 147+ sites. Request the operator partnership brief for revenue-share and supply terms.
Exact figures pending verification. Request the ROI calculator for site-specific math.
| Container-load unit cost (FOB Qingdao) | [NEEDS_VERIFICATION] |
| Vehicles per 40HQ container | [NEEDS_VERIFICATION] |
| Per-asset monthly revenue (operator model) | [NEEDS_VERIFICATION] |
| Payback period per asset | [NEEDS_VERIFICATION] |
Implementation
A typical project runs consultation to handover in roughly 9–11 weeks, depending on customization and freight.
| Phase | Duration | Activities |
|---|---|---|
| Partnership & terms | Week 1–2 | MOQ, territory, supply agreement, spec lock |
| Production | Week 3–7 | Container-load build, smart-lock + geofence config |
| Shipping | Week 8–10 | FOB Qingdao, full container load |
| Deployment & onboarding | Week 11 | Commission, ops app setup, launch |
Ready for fleet operators?
Tell us your site, quantity, and timeline. We'll send tiered FOB Qingdao pricing, a container packing estimate, and a deployment plan tuned to fleet operators.