悠悠车系列
Yo-yo Series
Compact 4-seater with a cute, kid-pulling design — 100 km range.
Solutions · National & state parks
National and state parks face emissions bans in sensitive zones and rugged daily use. Minibus EV delivers zero-emission, geofenced visitor transport with the durability and gradeability scenic terrain demands.
Industry snapshot
Government and conservation bodies worldwide are restricting internal-combustion vehicles in protected and high-footfall natural zones. Procurement teams need low-speed, zero-emission, durable fleets that meet public-sector compliance.
Recommended models
Models our operating data shows fit this industry. Each can be themed and branded to your operation.
Reading list: See the full Electric vs Gas comparison, landed cost breakdown, and complete buyer's guide for the math behind this industry’s fleet decisions.
悠悠车系列
Compact 4-seater with a cute, kid-pulling design — 100 km range.
Why: 25° gradeability and 100 km range suit trailhead-to-viewpoint loops in smaller parks.
福象福鹿系列
Premium line with enhanced finishes — the higher-end themed option.
Why: Premium line for flagship visitor centers where finish and durability both matter.
Case study
东平国家森林公园 · Shandong, China
Dongping National Forest Park uses Minibus EV vehicles to move visitors through the forest without emissions or noise disturbing the environment. Geofencing keeps vehicles on designated routes. Fleet size and annual operating hours: [NEEDS_VERIFICATION].
Metrics marked [NEEDS_VERIFICATION] await manufacturer confirmation. We publish only verified figures.
Public-sector parks replacing gas shuttles with electric Minibus EV fleets cut fuel and maintenance costs while meeting emissions mandates. Request the ROI calculator tailored to public procurement cycles.
Exact figures pending verification. Request the ROI calculator for site-specific math.
| Fuel cost reduction vs gas | [NEEDS_VERIFICATION] |
| Annual maintenance saving per vehicle | [NEEDS_VERIFICATION] |
| Emissions compliance value | Mandate met |
| Payback period | [NEEDS_VERIFICATION] |
Implementation
A typical project runs consultation to handover in roughly 9–11 weeks, depending on customization and freight.
| Phase | Duration | Activities |
|---|---|---|
| Consultation & compliance | Week 1–2 | Route survey, geofence mapping, procurement docs |
| Production & customization | Week 3–6 | Livery, geofence config, durability spec |
| Shipping | Week 7–9 | FOB Qingdao, container freight |
| Deployment & handover | Week 10 | Commission, ranger training, route testing |
Ready for national & state parks?
Tell us your site, quantity, and timeline. We'll send tiered FOB Qingdao pricing, a container packing estimate, and a deployment plan tuned to national & state parks.